What are the responsibilities and job description for the MRP Planner position at Prolim?
Job description:
Must Have below skills:
- Manufacturing experience and or production line experience
- Materials Requirements Planning (MRP), validating/creating a manufacturing production schedule
- Updating work orders based on engineering change orders (ECOs)
- Experience reading an Integrated Master Schedule (IMS), pull out the production requirements that apply to them, create a material plan to meet that schedule
Responsibilities include:
- Perform work order variance analysis and review MRP execution and ensures accuracy of information, reconciles supply and demand, validates master scheduling requirement.
- Performs risk analysis, identifying and resolving critical path and MRP logic conflicts.
- Analyzes risks to identified solutions and bottlenecks, including forward and reverse scheduling methods, for schedule recovery.
- Planner must understand manufacturing capacity and allocate as required to meet build plan commitments. Expedites and reschedules open purchase orders to suit production-planning requirement.
- Create and release manufacturing orders based on bill-of-materials and configuration. Close work orders after sub-assemblies, ensure assemblies and integration are complete.
- Track material shortages for manufacturing orders, kits, sub-assemblies based on bill-of-material or drawings/configuration. Communicate to program team and management critical part shortages that will jeopardize ship schedule.
- Maintain inventory including shelf-life sensitive material and tooling for the program.
- Coordinates and expedites flow of materials, parts, and assemblies between departments, according to manufacturing schedules or priorities, and compiles and maintains manual or computerized record.
- Prepares purchase requests for the purchase of components or parts based on a master production schedule, shop load, and inventory requirements.
- Update Work Orders based on Engineering Change Orders (ECOs).
Job Description:
- Analyzes all scheduling reports including capacity base on work breakdown schedule, material requirements list and production plans for work centers.
- An understanding of how a Bill of Materials is developed and managed through the product life cycle, including identifying make and buy parts and revision control of parts.
- Must understand & execute material requirements planning (MRP), capacity planning and other advanced material planning needs
- Advises management of the status of work in progress, material availability and production problems to ensure that personnel/equipment, materials, and services are provided as needed; confirms material supply and demands.
First Shift (7a-5p)
Onsite 100%
1-2 years experience
Job Type: Contract
Pay: $20.00 - $24.00 per hour
Schedule:
- 8 hour shift
Work Location: In person
Salary : $20 - $24
Plant Planner
Bayer -
Oxnard, CA
Senior Planner
City of Oxnard -
Oxnard, CA
Housing Planner
City of Oxnard -
Oxnard, CA