Contract Opportunity for Clearing Encumbrances - Tule River Spillway Enlargement Project

Next Level Media Marketing LLC
Porterville, CA Full Time
POSTED ON 6/14/2024

Description:

Next Level Media Marketing is seeking qualified contractors or small business owners to provide services for clearing encumbrances on select properties adjacent to Lake Success. This contract supports the Tule River Spillway Enlargement Project to ensure it can operate as designed once construction is complete. The selected businesses must have the necessary insurance and past performance reviews for consideration.

Scope of Work:

The Performance Work Statement outlines the basic objectives of the project, offering contractors the flexibility to develop cost-effective solutions and propose innovative alternatives. The contract includes a variety of tasks, as detailed below:

Pricing Schedule and Work Elements:

Base Bid Tasks:

001 Plan Preparation: Develop all necessary plans including Accident Prevention, Quality Control, Environmental Protection, Weed Control, and Irrigation Design.

002 Layout and Site Setup: Stake work limits, setup safety fencing, staging area, and construction signs.

003 Prepare SWPPP and Install BMPs: Develop Stormwater Pollution Protection Plan and install Best Management Practices.

004 SWPPP Inspections, Sampling & Report: Conduct weekly inspections, sampling, and reporting.

005 Obtain Permits: Secure all required federal, state, and local permits.

006 Provide Access & Maintenance Roads: Grade and maintain access roads, repair erosion damage, and restore newly created roads post-construction.

007 Fence Removal: Remove 42,240 linear feet of perimeter fencing.

008 Excavation: Remove septic systems and building foundations.

009 Demo Houses: Demolish two residences and surrounding outbuildings.

010 Orchard Tree Removal and Reseeding: Remove 42 orchard trees and reseed the area with native species.

011 Demo Well Pump, Slab, Screen, and Casing: Demolish well components and place grout.

012 Haul and Disposal: Transport debris to an approved landfill.

013 Remove Stock Pond: Drain and remove the stock pond.

014 Remove Outbuildings: Clear various outbuildings and related structures.

015 Seed Disturbed Areas: Grade and seed disturbed areas with native species.

016 Monthly Activity Records: Prepare as-builts and monthly activity records.

017 Restoration and Cleanup: Maintain roads and firebreaks, remove BMPs, and perform general cleanup.

018 Annual Report #1: Document site conditions with as-builts, monthly activity records, and photo documentation.

General Information:

This contract involves removing encumbrances to account for the rise in water levels on Lake Success due to the Tule River Spillway Enlargement project. The major work elements include removing old perimeter fencing, electrical panels, stock ponds, residences, outbuildings, orchards, wells, and performing maintenance and cleanup tasks.

Submission Requirements:

Interested businesses must submit:

Proof of necessary insurance

Past performance reviews

Next Steps:

Once submissions are received, we will review and evaluate them to select the most qualified businesses for specific pricing quotes.

Deadline for Submissions:

The deadline for submitting quotes is May 25, 2024.

Join us in ensuring the success of the Tule River Spillway Enlargement Project by providing your expertise in this essential clearing and restoration work. We look forward to your innovative solutions and competitive proposals.

Job Type: Contract

Pay: $27.95 - $33.66 per hour

Schedule:

  • 8 hour shift

Experience:

  • Negotiation: 1 year (Preferred)

Ability to Commute:

  • Porterville, CA 93257 (Required)

Ability to Relocate:

  • Porterville, CA 93257: Relocate before starting work (Required)

Work Location: In person

If your compensation planning software is too rigid to deploy winning incentive strategies, it’s time to find an adaptable solution. Compensation Planning
Enhance your organization's compensation strategy with salary data sets that HR and team managers can use to pay your staff right. Surveys & Data Sets

Sign up to receive alerts about other jobs that are on the Contract Opportunity for Clearing Encumbrances - Tule River Spillway Enlargement Project career path.

Click the checkbox next to the jobs that you are interested in.

Income Estimation: 
$77,948 - $102,665
Income Estimation: 
$92,789 - $114,732
Income Estimation: 
$66,450 - $86,367
Income Estimation: 
$73,012 - $101,385
Income Estimation: 
$104,817 - $138,425
Income Estimation: 
$59,662 - $75,230
Income Estimation: 
$66,450 - $86,367
Income Estimation: 
$104,817 - $138,425
Income Estimation: 
$64,176 - $79,192
Income Estimation: 
$77,948 - $102,665

Sign up to receive alerts about other jobs with skills like those required for the Contract Opportunity for Clearing Encumbrances - Tule River Spillway Enlargement Project.

Click the checkbox next to the jobs that you are interested in.

  • Brand Management Skill

    • Income Estimation: $59,288 - $79,191
    • Income Estimation: $64,867 - $82,481
  • Branding Skill

    • Income Estimation: $58,192 - $76,453
    • Income Estimation: $62,649 - $86,924
View Core, Job Family, and Industry Job Skills and Competency Data for more than 15,000 Job Titles Skills Library

Not the job you're looking for? Here are some other Contract Opportunity for Clearing Encumbrances - Tule River Spillway Enlargement Project jobs in the Porterville, CA area that may be a better fit.

Operations Personnel-Safety Officer

Lower Tule River & Pixley Irrigation District, Tipton, CA

Medication Assisted Treatment Coordinator

Tule River Indian Health Center, Inc, Porterville, CA