Draw initial set of proposal drawings based on architecturals and design feedback/intent/guidance from sales team.
December 14, 2022
Works at a desk and a computer screen for extended periods of time.
January 09, 2023
Prepare output data for manufacturing on production lots using the master files as a starting point.
March 12, 2023
Design structures, linkages and assemblies to meet structural functional and aesthetic requirements.
March 14, 2023
Provide necessary drawings to allow manufacturing to fabricate and build cabinetry, doors, ports, vents etc.
April 01, 2023
Update proposal drawings post frame walk to finalize master files such that project is ready for production lots.
April 05, 2023
Develop designs for commercial, domestic and industrial uses.
April 24, 2023
Evaluate and select appropriate components to meet functional requirements while minimizing overall costs.
May 13, 2023
Complete changes to master files when changes are encountered post models.
May 20, 2023