How much does a Construction Scheduler make in Maine?
As of July 01, 2026, the average salary for a Construction Scheduler in Maine is $68,542 per year, which breaks down to an hourly rate of $33.
However, a Construction Scheduler's salary can vary significantly. Here’s a look at the typical salary range:
- Top Earners (90th percentile): $81,805
- Majority Range (25th-75th percentile): $61,804 to $75,484
- Entry-Level (10th percentile): $55,670