How much does a Construction Scheduler make in Washington?
As of July 01, 2026, the average salary for a Construction Scheduler in Washington is $76,226 per year, which breaks down to an hourly rate of $37.
However, a Construction Scheduler's salary can vary significantly. Here’s a look at the typical salary range:
- Top Earners (90th percentile): $90,975
- Majority Range (25th-75th percentile): $68,733 to $83,946
- Entry-Level (10th percentile): $61,911