Skills & Competencies for Planner/Scheduler IV - Construction

Planner/Scheduler IV - Construction job profile

JOB SUMMARY for Planner/Scheduler IV - Construction

Collects and analyzes information used to plan and schedule construction projects.

JOB RESPONSIBILITIES for Planner/Scheduler IV - Construction

Generates forecasts, variance reports, and other documentation used to monitor and manage projects. Researches and reports on economic, legal, and other factors that may impact project success. Develops standards to utilize on all project planning and scheduling. May have budget planning responsibility for the project. Expert with standard planning and scheduling methodologies and tools. Prepares plans and schedules for large and complex projects or multiple projects.

Planner/Scheduler IV - Construction SALARY RANGE

BASE 50%
$148,603
TOTAL 50%
$150,962
Job Level
P04
Job Code
SC16000361
Education/Degree
Bachelor's Degree
Reports To
Manager or Head of a Unit/Department

Planner/Scheduler IV - Construction Skills and Competencies List

Proficiency Levels and Behavioural Indicators
Salary.com identifies five increasing levels of proficiency for each skill/competency. Some jobs require only a relatively low level of proficiency in each skill/competency, while other jobs will require a more advanced level of proficiency in the same skill/competency. These levels rate the degree of proficiency (skill level, expertise) we expect the incumbent to perform in the given skill/competency for the given job. Note that we intentionally do not associate timeframes or years of experience in performing the skill/competency because that can be misleading. Proficiency levels identify what the incumbent knows and can do rather than how long they have been doing it. Also, note that the proficiency levels are cumulative, e.g., a level 4 proficiency implies the ability to perform all the behaviors at the lower levels.
Check each Planner/Scheduler IV - Construction skill and competencie below to view definitions.

2 hard skills or competencies (industry competencies) for Planner/Scheduler IV - Construction

1 Industry Competency – Civil Engineering
Proficiency Level -3
Skill definition-Overseeing the safe design, construction, and maintenance of structures and environments.
Level 1 Behaviors
(General Familiarity)
Names the different types or specialized areas of civil engineering.
See 4 More Skill Behaviors
Level 2 Behaviors
(Light Experience)
Supports the civil engineering team with both technical drafting drawings and design initiatives.
See 4 More Skill Behaviors
Level 3 Behaviors
(Moderate Experience)
Uses advanced software to design detailed civil engineering plans.
See 4 More Skill Behaviors
Level 4 Behaviors
(Extensive Experience)
Oversees the design and execution of small- to large-scale civil engineering projects.
See 4 More Skill Behaviors
Level 5 Behaviors
(Mastery)
Stays abreast of the latest drafting standards to optimize quality civil engineering designs.
See 4 More Skill Behaviors
2 Industry Competency – Construction Estimating
Proficiency Level -3
Skill definition-Forecasting the total costs of building a structure to prevent business loss and protect profit margin.
Level 1 Behaviors
(General Familiarity)
Identifies automated tools used for construction estimations.
See 4 More Skill Behaviors
Level 2 Behaviors
(Light Experience)
Supports the team on estimating and bidding works for new projects.
See 4 More Skill Behaviors
Level 3 Behaviors
(Moderate Experience)
Works with pre-construction staff throughout the process to submit accurate bids and proposals on time.
See 4 More Skill Behaviors
Level 4 Behaviors
(Extensive Experience)
Reviews construction plans and specifications of heavy civil construction projects.
See 4 More Skill Behaviors
Level 5 Behaviors
(Mastery)
Leads teams in executing all phases of construction projects from pre-construction to completion.
See 4 More Skill Behaviors
3 Planner/Scheduler IV - Construction - Skill and Competency
Proficiency Level - 3
4 Skill and Competency - Planner/Scheduler IV - Construction
Proficiency Level - 4
5 Competency for - Planner/Scheduler IV - Construction
Proficiency Level - 5

9 general skills or competencies (Job family competencies) for Planner/Scheduler IV - Construction

1 Job Family Competencies – Change Management
Proficiency Level -3
Skill definition-Implementing change by transforming our organization's goals, processes, or technologies to ensure business growth and success.
Level 1 Behaviors
(General Familiarity)
Lists the methodologies and best practices of change management.
See 4 More Skill Behaviors
Level 2 Behaviors
(Light Experience)
Supports auditing and reporting related to change management to help resolve transformations and claims.
See 4 More Skill Behaviors
Level 3 Behaviors
(Moderate Experience)
Works with the management team to develop change orders or proposals.
See 4 More Skill Behaviors
Level 4 Behaviors
(Extensive Experience)
Reviews accounting activities to comply with change management policies.
See 4 More Skill Behaviors
Level 5 Behaviors
(Mastery)
Promotes change management to assure maximum operational effectiveness.
See 4 More Skill Behaviors
2 Job Family Competencies – Microsoft Project
Proficiency Level -3
Skill definition-Developing schedule, assigning resources to tasks, managing budget, and keeping project plans on time.
Level 1 Behaviors
(General Familiarity)
Identifies the principles and practices of project management with Microsoft Project.
See 4 More Skill Behaviors
Level 2 Behaviors
(Light Experience)
Tracks completed work at assigned projects using Microsoft Project software.
See 4 More Skill Behaviors
Level 3 Behaviors
(Moderate Experience)
Utilizes Microsoft Project software to manage the schedule of project plans.
See 4 More Skill Behaviors
Level 4 Behaviors
(Extensive Experience)
Oversees the Microsoft Project to provide guidance based on operational objectives.
See 4 More Skill Behaviors
Level 5 Behaviors
(Mastery)
Promotes the new features and versions of Microsoft Project to align various project plans.
See 4 More Skill Behaviors
3 Planner/Scheduler IV - Construction - Skill and Competency
Proficiency Level - 3
4 Skill and Competency - Planner/Scheduler IV - Construction
Proficiency Level - 4
5 Competency for - Planner/Scheduler IV - Construction
Proficiency Level - 5

9 soft skills or competencies (core competencies) for Planner/Scheduler IV - Construction

1 Core Competencies – Gathering Information
Proficiency Level -3
Skill definition-Accumulating necessary information from various resources to clarify the situation or make an informed business decision.
Level 1 Behaviors
(General Familiarity)
Names commonly used tools and techniques for data collection.
See 4 More Skill Behaviors
Level 2 Behaviors
(Light Experience)
Obtains needed information by asking skillful and persistent questions.
See 4 More Skill Behaviors
Level 3 Behaviors
(Moderate Experience)
Utilizes various tools and technologies to validate information acquired from different sources.
See 4 More Skill Behaviors
Level 4 Behaviors
(Extensive Experience)
Synthesizes information from various sources to enable strategic decision-making by our leadership.
See 4 More Skill Behaviors
Level 5 Behaviors
(Mastery)
Takes steps to ensure that the intellectual property rights of others are not violated.
See 4 More Skill Behaviors
2 Core Competencies – Predictive Analytics
Proficiency Level -3
Skill definition-Gathering, analyzing, and predicting patterns and structures of historical data and trends to make strategic decisions for better future outcomes.
Level 1 Behaviors
(General Familiarity)
Lists various kinds of applications that use predictive analytics.
See 4 More Skill Behaviors
Level 2 Behaviors
(Light Experience)
Interprets the reasons for statistical errors, misinterpretations, and false positives.
See 4 More Skill Behaviors
Level 3 Behaviors
(Moderate Experience)
Works with teams in using different kinds of cross-validation to test results of predictive models.
See 4 More Skill Behaviors
Level 4 Behaviors
(Extensive Experience)
Researches and lists the cases that are predicted wrongly and then learns how to improve.
See 4 More Skill Behaviors
Level 5 Behaviors
(Mastery)
Stays current with the latest research on predictive analytics.
See 4 More Skill Behaviors
3 Planner/Scheduler IV - Construction - Skill and Competency
Proficiency Level - 3
4 Skill and Competency - Planner/Scheduler IV - Construction
Proficiency Level - 4
5 Competency for - Planner/Scheduler IV - Construction
Proficiency Level - 5

Summary of Planner/Scheduler IV - Construction skills and competencies

There are 2 hard skills for Planner/Scheduler IV - Construction, Civil Engineering, Construction Estimating.
9 general skills for Planner/Scheduler IV - Construction, Change Management, Microsoft Project, Project Communications, etc.
9 soft skills for Planner/Scheduler IV - Construction, Gathering Information, Predictive Analytics, Key Performance Indicators (KPI), etc.
While the list totals 20 distinct skills, it's important to note that not all are required to be mastered to the same degree. Some skills may only need a basic understanding, whereas others demand a higher level of expertise.
For instance, as a Planner/Scheduler IV - Construction, he or she needs to be skilled in Gathering Information, be skilled in Predictive Analytics, and be skilled in Key Performance Indicators (KPI).

It's Easy to Get Started

Get the precision you need to assess, hire, and develop top talent with skills and competencies – see how with a personalized demo.